Piles Last A Long Time: From a HundRed Years and More. The Only Condition for Structures of this Kind: Periodically Treat Them with a Special Chemical Composition. INDITION, IT SHOULD BE NOTED THAT THE SCREW PILES HAVE A HIGH REPAIRABILITY. Their Installation Period Varies From 1-3 Days, and A Small Group of 2-3 People Can Cope With This Work.
Do You Want to Know How Much Lawn Mowers Cost?? You Can Know The Exact Price On The Site .
IT IS Recommended To Starting Erecting Buildings On Helical Piles Immediately After Their Installation. High Strength Load Characteristic Gives This Type of Foundation The Necessary Margin of Load-Carrying Capacity for Wooden Structures 4-18 Tons, 7-9 – For Houses Made Of Bricks. This ability can be included by Increasing The Pile Blades and The Diameter of the Structure ITSELF. Screwed Piles Are Also Proposed As Anchoring Devices, As Well As Foundations for Soft Watered or Peaty Soils.
This Type of Foundation Is QUite Easy to Build on the Plot, Stones and Stumps, On the Lawn, Slopes, And Next To Large Trees. This Type of Work Can Be Done Even in the Winter. In Addition, The Buildings, Erected on Helical Piles Is Easy to Attach New Building Objects. In Terms of Rational Construction Erection Of Screw Piles – IT IS Economically Advantageous and Technically Simple and Reliable Solution.
Leave a Reply