The rules for applying plaster on brickwork have changed little over time.
Want to build a real hammam? We recommend that you go to the following link where you can order Hammam Construction Hammam offers a company who has many years of experience in building a bath, saunas and hammams.
It is necessary to wait for the complete sediment of the built building, then you can start plastering. Watching walls increase the strength, refractory and heat resistance of the building, contributes to noise insulation.
New brick surface prepare, cleaning steel brush. Seams deepen to 1 cm.
Walls are tested with a plumb in horizontal and vertical planes. Install beacons using measuring instruments. Prepare a solution from the finished mixture, according to the instructions. The mixture for external brick walls includes lime and sand, and for internal – cement and sand. Before the first application of the wall solution is wetted with water.
Apply the first layer of plaster, called spray, the consistency of the solution should be liquid so that it will impregnate the wall and compare irregularities. The second, the main layer – the soil, more thick, creates the main thickness of the plaster. The last layer is covered, make a drying second layer, for this layer there is a special blend where the sisted sand is included.
Ready-made stucco. Playing wall ready.